Thruster

P5 Cluster


LM4 operation with beam extraction in PEPL LVTF (chamber lights on). The engine is mounted on the thrust stand. The camera in mounted to an arm (shown in foreground) that is attached to a rotational theta table mounted above the engine.

Developed
2004

Tested at PEPL
2003

Developer
PEPL, AFRL

This thruster configuration studied the clustering two mid-power Hall thrusters and the effect of facility backpressure on Hall thruster performance.

Selected Publications


  • The H9 Magnetically Shielded Hall Thruster

    Hofer, R.R., Cusson, S.E., Lobbia, R.B., and Gallimore, A.D.

    35th International Electric Propulsion Conference, Atlanta,GA, IEPC-2017-232, 2017

  • Performance of the H9 Magnetically Shielded Hall Thrusters

    Cusson, S. E., Hofer, R. R., Lobbia, R. B., Jorns, B. A., and Gallimore, A. D.

    35th International Electric Propulsion Conference, Atlanta,GA, IEPC-2017-239, 2017